Perfect performance, zero‑defect guarantee for Corporate Purchasing Managers and Operations Directors who demand the right size, right material, right delivery for every match‑day or training session.
Get Free Quote in 24 hWhen you order a football that doesn’t meet the official Size 5 standard, you face:
According to Mordor Intelligence (2025), over 51 % of the global football market is dominated by Size 5 balls, yet 12 % of bulk orders still fail quality audits because of improper sizing or material choice.
Stop losing ROI on the wrong ball – choose a partner that guarantees the exact football size for adults you need.
Discover the solution →| Parameter | Specification | Standard / Test |
|---|---|---|
| Size (Circumference) | 68–70 cm (27.6–27.8 in) | FIFA Regulation |
| Weight | 410–450 g (14.5–15.9 oz) | FIFA Regulation |
| Material (Outer Cover) | Thermally‑bonded PU (Polyurethane) 100 % PU‑laminate | ISO 9001, CE |
| Inner Bladder | Latex‑free butyl or TPU bladder – 0.5 mm thickness | ISO 14001, RoHS |
| Panel Design | 6‑panel, 12‑panel, or 32‑panel (custom) | FIFA Quality Test (QT‑1) |
| Water Absorption | ≤ 0.2 % after 30 min immersion | FIFA QT‑2 |
| Impact Resistance | ≥ 25 kJ (drop test from 2 m) | ISO 9001 |
| Color & Graphics | Custom UV‑stable inks, 5‑year fade guarantee | OEM/ODM |
Case 1 – National Youth League (Europe)
Delivered 20 000 Size 5 balls within 75 days. Teams reported a 12 % increase in ball‑flight consistency during tournaments, verified by independent performance labs (see BRI 2026 report).
Case 2 – US College Athletics
OEM‑branded balls with RFID sensors for training analytics. Reduced ball‑replacement cost by 18 % over two seasons; athletes praised the “true‑size feel”.
football-match-balls-size-5 football-balls-size-5 football-pink football-ball-personalised
Case 3 – Community Sports Program (South America)
Bulk order of 50 000 low‑cost but CE‑certified balls. Shipping via sea freight from Tianjin Port averaged USD 0.45 per ball, 30 % cheaper than competing Chinese suppliers.
See who trusts us →The official Size 5 football (adult) measures **68–70 cm** (27.6–27.8 in) in circumference, complying with FIFA Regulation No. 2.
Yes. We offer 6‑panel, 12‑panel, 32‑panel, or any custom geometry. UV‑stable inks and OEM logo placement are available with a 5‑year fade guarantee.
Standard terms are 30 % T/T deposit, 70 % balance before shipment. For repeat customers, we accept L/C at sight or open‑account after 6 months of successful trade.
From order confirmation to port loading: **90 days** (factory → Tianjin Port). Sea freight to major EU ports averages **30 days**, US West Coast **35 days**. Air freight options are available at a premium.
All our balls are **CE**, **ISO 9001**, **ISO 14001**, **RoHS**, and **FCC** compliant. We use **latex‑free butyl** bladders to meet allergy‑safety standards.
A dedicated account manager, 24 / 7 email support, and a 12‑month warranty covering material defects. We also offer free replacement for any ball failing FIFA QT‑1 within the warranty period.
Limited‑time offer: **Free sample pack (5 pcs)** for first‑time corporate buyers + **30 % off** on orders > 50 000 units. Stock is limited; our production line fills fast during peak season.
Linda K., Procurement Lead – “The **size accuracy** was spot‑on. Our youth league saw a 15 % drop in ball‑replacement cost.”
Mark T., Operations Manager – “Fastest shipping I’ve experienced from China. Balls arrived in perfect condition, ready for the season opener.”
Sarah P., Technical Director – “Custom graphics stayed vivid after 20 games. Players commented on the superior grip.”
Ahmed R., Supply Chain Manager – “The CE & ISO certificates made our internal audit a breeze. No more paperwork headaches.”
Hebei Starry Sports Goods Co., Ltd
South Street, Xingji Town, Cangzhou, Hebei, China
Phone: +86 157 1337 0191 | +86 153 6983 2815
Email: starry005@ballschina.com
Contact Us Online
WELCOME TO INQUIRE
HOT SALE PRODUCTS
Are you ready to elevate your soccer game to the next level? Whether you’re practicing your dribbling skills in the backyard, playing a friendly match at the park, or competing in a local league, this soccer ball is the perfect companion for all your soccer adventures.
LATEST NEWS
Crafted with precision and care, our soccer ball features a durable rubber core that ensures excellent bounce and resilience. The rubber material is not only lightweight but also provides the ideal amount of grip, allowing players to control the ball with ease. This means you can focus on perfecting your shots, passes, and tricks without worrying about the ball slipping away from you.
26,04 , 2026
Custom Mini Basketball Ball for Branding and Promotional Use
In today’s competitive marketplace, brands are constantly searching for creative, cost-effective way
READ MORE24,04 , 2026
Size Guide for Basketballs Wholesale: From Youth to Professional
Choosing the right basketball size is one of the most important decisions for wholesalers, sports eq
READ MORE23,04 , 2026
Outdoor vs Indoor Basketballs Wholesale: Key Differences
When sourcing basketballs in bulk, understanding the difference between outdoor and indoor models is
READ MORE
Trusted by Global Brands & Certified for Excellence